LL152 Filing Guide: Sign, Pay & Submit in DOB NOW
The inspection is done, the report is in your hands, and your plumber says the filing is "ready for your signature." This is the last stretch of Local Law 152, and it's the part owners most often leave half-finished. A filing that sits saved but unpaid in DOB NOW counts the same as no filing at all.
This guide from Above & Beyond Plumbing & Heating walks you through finishing an LL152 gas piping certification that a plumber has already prepared. It takes about 10 minutes. Keep it open beside DOB NOW and tap each step as you go.
Don't have a DOB NOW account yet? Start with our DOB NOW account setup guide, then come back here.
Before you start, have these ready
Why the Owner Has to Finish the Filing
Since July 27, 2026, Local Law 152 certifications go through DOB NOW: Safety instead of the old GPS2 portal. Your Licensed Master Plumber (at Above & Beyond, that's our NYC LMP License #2403) enters the inspection results, but DOB requires the building owner to log in with NYC.ID and attest to every certification. In other words, the plumber can't sign for you.
Timing matters here. The certification is due within 60 days of the inspection, and buildings in Community Districts 4, 6, 8, 9 and 16 must be certified by December 31, 2026. For the full background on deadlines and penalties, see our Local Law 152 gas piping inspection guide.
How to Sign, Pay and Submit Your LL152 Filing in 7 Steps
Tap a step to open it.
LL152 Filing Fees You May See
DOB charges these fees to private owners. If no fee applies to your filing, the button reads Submit instead of Pay to File.
| Filing | Fee |
|---|---|
| Initial Certification, building has gas service | $35 |
| Initial Certification, no gas piping | $375 |
| Initial Certification, gas piping but no gas service | $480 |
| Certification of Correction | $35 |
| Extension request | $35 |
Source: DOB Service Notice Follow-up #8. These are city fees only and don't include your plumber's inspection or repair costs.
What Happens After You File
If the inspection found no problems
You're done for this cycle. Your next inspection falls four years later, on the same schedule for your Community District. Put a reminder in your calendar for early in that year, not December.
If the inspection found conditions to correct
You still have one more filing. Once repairs are finished, a Licensed Master Plumber files a Certification of Correction within 120 or 180 days of the inspection date, depending on what the initial certification says. You'll attest to that one too. Note that DOB doesn't let the owner submit the Certification of Correction alone. A plumber has to confirm the work.
Repairs often need a DOB permit, so book them right away. Our team handles gas line and commercial plumbing repairs, plus fixes on gas boilers and water heaters. If old equipment is the real problem, it may be time to look at a new heating system installation.
If you need more time
If the plumber selected 120 days and repairs are running long, you can file a Certification of Correction Extension Request in DOB NOW for $35, up to the 180-day limit.
Troubleshooting Your LL152 Filing
Filing isn't on my dashboard
Check that you signed in with the email your plumber used. If you did, ask them to confirm the owner email on the filing.
Details look wrong
Don't sign. Close the filing and contact your plumber so they can correct it before you attest.
Payment failed or froze
Before you retry, check your bank and the dashboard so you don't pay twice. Keep any reference number.
Still says "Pre-filing"
Then the filing hasn't gone in. Go back, open it and finish Pay to File.
For portal errors, use the DOB NOW Help form. DOB also posts its own step-by-step guide and video tutorials on the DOB NOW: Safety Gas Piping Resources page. General LL152 questions go to the Gas Piping System Compliance Unit at (212) 323-8001.
Already Got a Violation?
If DOB issued a failure-to-file violation, paying the $5,000 penalty ($1,500 for three-family homes) won't clear it on its own. You still need to submit the certification. In DOB NOW, go to Violations and Notices of Deficiency, then Waivers and Challenges, and choose Gas Piping - LL152. From there, you can challenge within 30 days if you already filed, or request a waiver if you qualify, as explained in DOB Follow-up #7. Our violation corrections and removals service and our breakdown of NYC plumbing violations can help you sort it out.
LL152 Final Filing FAQs
How long do I have to file after the inspection?
The certification is due within 60 days of the inspection, and no later than your sub-cycle deadline unless you have an approved extension.
Can my property manager sign instead of me?
An owner's representative can be listed on the filing and attest as well. Still, DOB requires the building owner's attestation on each certification. Managers juggling several buildings can lean on our property management plumbing services.
Do I still need a GPS2 form?
No. The Initial Certification in DOB NOW replaced the GPS2 on July 27, 2026.
How do I know DOB approved my filing?
The status on your dashboard changes to Approved. You can also search your building on the DOB NOW Public Portal under SAFETY: Compliance Filings.
My building has several owners. Who signs?
The owner listed on the filing attests. If you're unsure who that should be, ask your plumber or attorney before you sign.
Need Help Finishing Your Filing?
Above & Beyond Plumbing & Heating, NYC Licensed Master Plumber #2403, handles LL152 inspections, gas piping repairs and the follow-up filings for buildings across all five boroughs. If something on your filing doesn't look right, give us a call before you sign.

WE OFFER 24/7 EMERGENCY SERVICE, 365 DAYS A YEAR.
Call (718) 484-4911Â for Emergency Plumbing in ALL 5 BOROUGHS
Plumbing and heating issues are unpredictable. Therefore, our expert plumbers are standing by 24 hours a day, 7 days a week for plumbing and heating emergencies. Whether it’s for a residential or commercial property, we are here for you!






























